Oil barge
Thursday November 15th 2012, launch of the first oil barge 1200m3 ordered by SEP CONGO.
59,9 meters long, 12 meters large, the first barge will be delivered two (2) months before the predicted date, due notably by using a methodology of fabrication by “blocks” which is more efficient.
The construction will have lasted six (6) months starting from the arrival of the metal sheets.