Wednesday 11/09/2013 was the launch of the barge 1200m³ classified Veritas TANKER.

August 23, 2013

Inauguration of the future Belgium Embassy site on the 12/08/2013 in Kinshasa.

The Chanic Group has had the honor of being one of the participants at the first Automobile and equipment salon from Thursday May 30th to Sunday June 2nd 2013 in the Democratic Republic of Congo.

The Martys stadium was specially re-organised for this event which gave us the opportunity to present and expose our biggest brands and to reveal our products to the public.

We were also happy to welcome M. Morians Gonzalo, African Director of the Group GESAN, who presented seminars on electric generators during the Automobile and equipment salon.

The Chanic group would like to thank Millenium, under the patronage of his Excellency M. the Prime Minister, Chief of the Government of the Democratic Republic of Congo and to all the participants who contributed to this first edition being a success.

Friday 05/04/2013, the Direction of SEP came to our workshop to note the evolution of the second barge 1200m3 classified VERITAS.

 

Majestic I and Majestic II have chosen the motor Baudouin for its motorization.

March 13, 2013

Thursday November 15th 2012, launch of the first oil barge 1200m3 ordered by SEP CONGO.

59,9 meters long, 12 meters large, the first barge will be delivered two (2) months before the predicted date, due notably by using a methodology of fabrication by “blocks” which is more efficient.

The construction will have lasted six (6) months starting from the arrival of the metal sheets.

Wednesday October 10th 2018, fourth world construction of civil engineering. Permanent stock (pre-customs possible) in Kinshasa and Lubumbashi: grader, excavators, compactors, concrete pumps, truck crane…

Monday October 1st 2012, control visit of the Majestic River shell. Fluvial tourism is reborn on the river Congo.

Monday July 16th 2012, new GESAN generator arrival in Kinshasa.